In 2019, the Town of Collingwood filed a Notice of Completion for the Tenth Line and Mountain Road Improvements Schedule ‘C’ Municipal Class Environmental Assessment (Class EA). The purpose of the Class EA was to examine road and intersection improvements along the Tenth Line, from Sixth Street to Mountain Road (approximately 1.2 km) and along Mountain Road from Cambridge Street to the Tenth Line (approximately 1.3 km) in an effort to address capacity and operational deficiencies and to accommodate future growth. The project study area is depicted in the figure below.

The Preferred Design Option that was selected through the Class EA included the addition of vehicular lanes as well as on-road bicycle facilities for both roads.

Since the Class EA was completed, there have been changes to the guidance and standards for the design of bicycle facilities, which has caused the Town to re-examine and modify the Preferred Design Option.

By way of the Notice of Filing of Addendum, the Town is advising that the Preferred Design Option has been revised to remove the on-road bicycle facilities and, instead, proposes to accommodate active transportation through the incorporation of sidewalks and multi-use paths for both roads.

An Addendum Report has been prepared and contains details of the proposed modifications to the Preferred Design Option. The Addendum Report is being placed on the public record for a 30-day review and comment period. Please note that only the changes proposed by the Addendum are open for review.

In 2019, the Town of Collingwood filed a Notice of Completion for the Tenth Line and Mountain Road Improvements Schedule ‘C’ Municipal Class Environmental Assessment (Class EA). The purpose of the Class EA was to examine road and intersection improvements along the Tenth Line, from Sixth Street to Mountain Road (approximately 1.2 km) and along Mountain Road from Cambridge Street to the Tenth Line (approximately 1.3 km) in an effort to address capacity and operational deficiencies and to accommodate future growth. The project study area is depicted in the figure below.

The Preferred Design Option that was selected through the Class EA included the addition of vehicular lanes as well as on-road bicycle facilities for both roads.

Since the Class EA was completed, there have been changes to the guidance and standards for the design of bicycle facilities, which has caused the Town to re-examine and modify the Preferred Design Option.

By way of the Notice of Filing of Addendum, the Town is advising that the Preferred Design Option has been revised to remove the on-road bicycle facilities and, instead, proposes to accommodate active transportation through the incorporation of sidewalks and multi-use paths for both roads.

An Addendum Report has been prepared and contains details of the proposed modifications to the Preferred Design Option. The Addendum Report is being placed on the public record for a 30-day review and comment period. Please note that only the changes proposed by the Addendum are open for review.

  • Notice of Filing of Addendum

    Share Notice of Filing of Addendum on Facebook Share Notice of Filing of Addendum on Twitter Share Notice of Filing of Addendum on Linkedin Email Notice of Filing of Addendum link

    The Notice of Filing of Addendum advises the Public that the Preferred Design Option for this project has been revised to remove the on-road bicycle facilities and, instead, proposes to accommodate active transportation through the incorporation of sidewalks and multi-use paths for both roads. The Notice has been published in the local newspaper where it will posted for two (2) weeks.

    Notice of Filing of Addendum

  • Presentation to Council

    Share Presentation to Council on Facebook Share Presentation to Council on Twitter Share Presentation to Council on Linkedin Email Presentation to Council link

    On January 16, 2023, the Ainley Group made a presentation to Council regarding the proposed design changes outlined in the Addendum Report.

    January 16, 2023 - Presentation to Council

  • Tenth Line and Mountain Road Improvements - Class EA Addendum Report

    Share Tenth Line and Mountain Road Improvements - Class EA Addendum Report on Facebook Share Tenth Line and Mountain Road Improvements - Class EA Addendum Report on Twitter Share Tenth Line and Mountain Road Improvements - Class EA Addendum Report on Linkedin Email Tenth Line and Mountain Road Improvements - Class EA Addendum Report link

    The Municipal Class Environment Assessment (MCEA) document, as published by the Municipal Engineers Association, outlines a planning process for municipalities to follow to complete infrastructure projects in an environmentally responsible manner and in accordance with the Environmental Assessment Act (EAA).

    In 2019, Ainley Group, on behalf of the Town of Collingwood, filed a Notice of Completion for the Tenth Line and Mountain Road Improvements Schedule ‘C’ Municipal Class Environmental Assessment (Class EA). The purpose of the Class EA was to examine road and intersection improvements along the Tenth Line, from Sixth Street to Mountain Road (approximately 1.2 km)and along Mountain Road from Cambridge Street to the Tenth Line (approximately 1.3 km) in an effort to address capacity and operational deficiencies and to accommodate future growth.

    If there are any significant modifications to a project or changes in the environmental setting for a project that occur after the filing of the ESR, this is to be reviewed by the proponent and an addendum to the ESR completed.

    The addendum must describe the circumstances necessitating the change, the environmental implications of the change, and what, if anything can and will be done to mitigate any negative environmental impacts.

    Tenth Line and Mountain Road Improvements - Class EA Addendum Report