Interim Control Bylaw (ICBL) & Moving to a New Servicing Capacity Allocation Framework Supporting a Complete Community

Share on Facebook Share on Twitter Share on Linkedin Email this link
Aerial View of Collingwood. Photo credit: Al Sposato

NEW! Interim Control By-law (ICBL) exemption requests support accessory housing and economic development

The Town is now accepting ICBL exemption requests for ‘Accessory Residential Units’ in order to support affordable/attainable housing opportunities in our community. This form of housing, also known as secondary dwelling units, accessory apartments, or secondary suites, provides more rental housing options and is an important component in addressing the current housing crisis.

The Town will also continue to accept requests for ‘Changes of Use that do not require additional water capacity’ in commercial, industrial and institutional settings and where planning approvals are in place, in order

NEW! Interim Control By-law (ICBL) exemption requests support accessory housing and economic development

The Town is now accepting ICBL exemption requests for ‘Accessory Residential Units’ in order to support affordable/attainable housing opportunities in our community. This form of housing, also known as secondary dwelling units, accessory apartments, or secondary suites, provides more rental housing options and is an important component in addressing the current housing crisis.

The Town will also continue to accept requests for ‘Changes of Use that do not require additional water capacity’ in commercial, industrial and institutional settings and where planning approvals are in place, in order to support the business community and economic development.

Exemption requests will be reviewed and advanced to Council as they arise through the Strategic Initiatives Standing Committee. Please reach out to Planning Services by email to planning@collingwood.ca and Building Services by email to: building@collingwood.ca with any questions.

ICBL Exemption Application Request Form


2021 Building Statistics Presentation

The 2021 Building Statistics were presented at the January 17, 2022 Development & Community Services Standing Committee. The statistics illustrate that building growth continued despite the ICBL and water constraint issues.

2021 Building Statistics Presentation


Next Steps in Interim Control By-law, Land Use Planning Policy Study - Release of Second Draft

Council endorsed the recommended next steps contained within Staff Report P2021-38 Next Steps for a Servicing Allocation Framework on December 20, 2021. This will advance the Land Use Planning Policy Study and preparation of a servicing capacity allocation framework prior to the expiry of the Interim Control By-law No. 2021-024, as amended.

The next steps are:

  • Incorporate the proposed official policies into the first draft of the Town's updated Official Plan, targeted to be released in early 2022.
  • Hold a statutory public meeting of the proposed zoning by-law amendment at the January 24, 2022 meeting of Council;
  • Schedule a second round of public consultation on the revised Servicing Capacity Allocation Policy in January/February 2022 (date TBD). Please stay tuned to this page for more details on this consultation opportunity in the new year.

The presentation to Council can be viewed here.


UPDATE re: Accessory Residential Units ICBL Exemption Requests will be considered by Council.

Council passed a resolution during the December 13, 2021 meeting of Council, to continue to consider exemption requests for accessory residential dwelling units while the Interim Control By-law (ICBL) is in effect. For more information, please review Staff Report #CAO2021-15 – Interim Control By-law Exemption Requests – Commercial Projects with No Additional Water Capacity and Accessory Residential Units, which also granted five additional ICBL exemptions for various projects.

In the final report from the Town of Collingwood Affordable Housing Task Force, the importance of accessory residential units (also known as secondary dwelling units, accessory apartments, secondary suites, etc.) was emphasized as one of the pillars necessary to address the housing crisis. Land use planning legislation and policy at all levels of government also recognize the need for accessory residential units and supports streamlining approvals and/or permits necessary to establish these uses.

Exemption applications for accessory residential dwelling units will continue to be reviewed and advanced to Council for a decision as they arise.

If you would like to pursue an accessory residential dwelling unit on your property, please speak with Planning and Building Department staff.

ICBL Exemption Application Request Form.


Interim Control By-law, Land Use Planning Policy Study Engagement Sessions - We Want to Hear from You!

The Town hosted two consultation sessions with the general public and development community to provide the opportunity for feedback on servicing capacity allocation solutions. Based on a best practices review, tools were shared that the municipality can utilize to provide a fair and predictable process for servicing capacity allocation that clarifies how a finite resource can be managed in the best way for our community. A preliminary Water and Wastewater Allocation Policy along with zoning and official plan changes were presented for comment and feedback.

Two Virtual Presentations - Hosted through Zoom, were conducted on November 23, 2021:

Meridian Planning Consultants presented the preliminary Servicing Capacity Allocation Policy framework followed by a professionally facilitated Question-and-Answer period. Please review: Staff Report P2021-35 with a best practices review and the recommended tools for a Servicing Capacity Allocation Framework.

Were you unable to attend a session? You may provide comments and ask questions using the Questions and Comments Tools below or by email to planning@collingwood.ca or deliver comments to Town Hall, 97 Hurontario Street.

Written comments will be accepted until December 3, 2021.


UPDATE re: ICBL Exemption Requests

During the regular meeting of Council held July 19, 2021, 36 Interim Control By-law (ICBL) exemptions were granted to allow construction of 316 Single Dwelling Equivalent Units, using some of the remaining water capacity in Collingwood.

To view the full list of exemptions view Appendix C of Staff Report: CAO2021-10 Interim Control By-law No. 2021-024 – Evaluation of Exemption Requests

Next Steps:

  • For those developments and individuals who have been granted exemptions from the ICBL, your application can continue through the Planning process and building permits may be issued. Please contact the Planning Department should you have any questions.

  • For those developments and individuals who have not been granted exemptions from the ICBL, your planning application will continue to be processed and reviewed, however planning decisions from Council will not be made unless a future exemption is granted or until the completion of ICBL or the completion of the Planning Study. Please contact the Planning Department should you have any questions. No further exemptions for residential developments are being contemplated at this time. Please contact the Planning Department should you have any questions.

ICBL Exemption Requests

Staff Report CAO2021-10 is now available and will be considered at the SIC Meeting of July 5, 2021 at 2:00pm. This report provides an overview of the exemption requests received, the process undertaken when evaluating the requests and the recommended exemptions for the Strategic Initiatives Standing Committee and Council to consider. Details to how to watch and participate in the meeting are available on our website at https://collingwood.civicweb.net/Portal/MeetingInformation.aspx?Org=Cal&Id=777.


***NEW*** Now Accepting ICBL Exemption Requests - Exemption Application process now closed

At the Special Council meeting held June 3, 2021 Collingwood Town Council approved Staff Report CAO2021-07 Interim Control By-law No. 2021-024 - Exemptions and Procedure for Receipt and Evaluation of Exemption Requests.

Who should apply for an exemption:

Anyone that is planning to develop or construct a building in the Town of Collingwood before April 2022 who has not yet received a building permit and is changing the use of a property or requires water services supplied by the Town should submit an Exemption Request Form. This includes, but is not limited to, the following types of construction:

• Construction of individual homes, including individual infill lots

• New accessory apartments within a home

• New subdivisions, or sections of subdivisions waiting to be built

• Commercial development, including the addition of units within a commercial development not yet built

• Industrial development, including the addition of units within a commercial development not yet built

If you are not sure if you need to apply for an exemption, please email building@collingwood.ca or call 705-445-1030 ext. 3243. If you have any questions or concerns when completing the request form, please don’t hesitate to reach out to Clerk Services at clerk@collingwood.ca

The steps of this process are as follows:

  1. Applicant fills out the prescribed Exemption form available on Engage.Collingwood.ca and submits the form to the Town Clerk;
  2. Requests are received by Council and referred to the CAO for review by senior management and the Town solicitor; and
  3. Requests which are deemed to be eligible for possible ICBL exemptions are identified and, where applicable, performance conditions (such as the use of the water by a set date) or other terms are recommended in a staff report prepared for Council’s consideration.
  4. All request forms are to be submitted to clerk@collingwood.ca by no later than June 18, 2021, to be considered by the Strategic Initiatives Standing Committee on July 5, 2021, and Council on July 19, 2021.

At the Council meeting held April 26, 2021 Collingwood Town Council approved Staff Report P2021-12 Interim Control By-law & Land Use Planning Policy Study and associated Interim Control Bylaw (ICBL) BL2021-024, applicable to all lands within the Town of Collingwood.

Why was this Recommended?

Collingwood has a significant water capacity issue, while facing significant development growth. An Environmental Assessment has been completed for the expansion of the Water Treatment Plant, however the build will not be completed until 2025. By implementing the ICBL, this pause in development will enable us to determine the best ways to continue to build and support the best community possible in line with our Official Plan and Strategic Plan.

Collingwood’s ICBL generally restricts development that does not already have a building permit, however, work that does not use more water such as most residential renovations can continue. There are exemptions for construction, alteration and expansion projects such as decks, patios, fences, porches, accessory buildings or structures, temporary buildings or structures, and interior or exterior renovations to an existing building.

The Town is committed to rapidly developing a Land Use Planning Policy Study and implementing the outcomes as quickly as possible to limit negative impacts on development that represents a priority interest for the community.

What is an ICBL?

An ICBL is a tool provided by the Ontario Planning Act that effectively allows a municipality to halt development while it manages an identified issue.

Next Steps

  • The Chief Administrative Officer has been authorized to retain qualified consulting services as required including by non-standard procurement as may be deemed necessary in regard to the timely completion of the Land Use Planning Policy Study.

  • The Consultant will carry out a Land Use Planning Policy Study including, but not limited to, the consideration of: any required changes to the Town’s land use planning policies and/or regulatory framework resulting from water and wastewater servicing capacity limitations; and the implications of water and wastewater servicing constraints for growth management, servicing implementation and any other impacted policies within the Official Plan and as related to the Town’s land use planning policies and reinforcing a regulatory framework and delivering upon the Town’s Community-based Strategic Plan.

Public Engagement

  • Under the Land-Use Planning Policy Study process, there will be further opportunities for public engagement. Check back to this page for updates.

  • In addition, members of the public are welcome to provide comments and ask questions using the tools below. We will be collecting this feedback for general consideration and using it to update this page as appropriate.

Stakeholder Engagement

  • Council has provided direction to staff to specifically pursue insight from the development community that may expedite resolutions of identified planning


    issues caused by the water capacity challenges and potential exemptions to allow projects that are important to the community to continue. Check back to this page for updates.

  • Council gave direction to staff to engage the engineering community to provide any expertise that might identify possible opportunities for capacity release in the near term. Check back to this page for updates.

How is the Water Treatment Plant Expansion being paid for?

The Water Treatment Plant (WTP) is included in the Development Charges Background Study. The cost that has been included in the study is just over $50 Million (this is subject to change once the tender has closed). The funding for this project is 1) $41.7 Million contribution from New Tecumseth; 2) $8 Million from the Town of Collingwood's Development Charge fees; and 3) $1 Million from existing Water Reserves. At this time the Water DC Reserve Fund has a balance of $5.2 Million and the existing Water Reserve fund has a balance of $11.8 Million. Once the final costs are calculated a full financing plan will be developed, that may include a combination of the above Reserve Funds, internal borrowing and external debentures.

If you have respectful comments regarding the ICBL, please submit them here. Comments collected will be considered during the Land-Use Planning Policy Study process.

Introduction message
loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.

I am very familiar with the points allocation system implemented in North Grenville. The developers were included in the preparation of the bylaw and have found it to be a good direction for new applications. I do not believe it has been applied to applications already in the system.

I think the concept is very important and critical to a community getting what it wants and needs and not what is most profitable for the entrepreneurs. Developers are in for the bucks and not addressing the less profitable needs of the community. I think using water capacity as leverage in reviewing proposals is absolutely the right way to go. It is one of the few tools in the municipal tool box to control development.
Good work and please proceed as drafted with point reallocation as needed.

pjspence about 2 months ago

The proposed point system for water capacity allocation puts “an orderly and sequential expansion of the community outward from the existing built-up area” in the same category as “efficient land use”. These two seem unrelated, and arguably at odds with each other. There is nothing efficient about expanding the boundary of the built up area - it means fewer people on more land, more town infrastructure with less tax revenue, more energy and pollution per capita. For the sake of clarity, the expansion of the boundary of the town’s built-up area should be assigned to its own category. Further, as an option that has almost no merit, should it not also be assigned a negative score?

Nick Clayton 2 months ago

Please, let's not do anything piece-meal. I respectfully suggest that whatever study is being done that it considers various and many aspects of Collingwood's needs from the waterfront area to parks and from the Collingwood Terminals (what's going to happen there?) to our health needs with Collingwood General and Marine Hospital.

George Czerny-Holownia 9 months ago